MDF production plantZhytomyr region, 11-B Zhovtneva St., Korosten, Zhytomyr region
Completed in — 2010 Floor area: 42 hectares
The repair and construction work fulfilled: - earthwork operations;
- installation of monolithic reinforced-concrete foundation for the compression apparatus of the main engineering building;
- installation of monolithic reinforced-concrete foundation for the defibrator;
- assemblage of column, beam, truss metal structures;
- the arrangement of through tunnels 1, 2 of the main production complexes;
- the arrangement of communication channels between the main press and the through tunnels 1, 2;
- the arrangement of the monolithic foundation for the work with rubbing machine and diagonal saw;
- the arrangement of the foundation plates, beam and columns of the laying-up shop;
- the mounting of the metalwares, columns and girders;
- the arrangement of the monolithic ferroconcrete foundations of the power generating unit for building and equipment;
- the arrangement of the monolithic-frame part of the administrative-domestic building (ADB);
- civil and erection works of ADB, inner and outer finishing work of ADB, the installation of inner networks of ADB;
- the arrangement and the mounting of inner and outer walling of ADB;
- the arrangement of crushed stone and concrete preparation, the arrangement of surface proofer with polymeric materials of ferroconcrete constructions;
- the arrangement of of the monolithic ferroconcrete foundations, foundation beams, socle of wooden fibre preparation shop;
- the arrangement of the monolithic ferroconcrete foundations, foundation beams of bark shop;
- the arrangement of walling of the wooden fibre preparation shop;
- the arrangement of the civil and erection and finishing works of the wooden fibre preparation shop;
- the arrangement of the foundations, foundation beams, socle of the main production complex (MPC);
- the arrangement of the monolithic concrete industrial floor:
- - of main press,
- - of through tunnels 1, 2,
- -of building of bark shop,
- - of the wooden fibre preparation shop,
- - of the power generating unit;
- the arrangement of the monolithic ferroconcrete foundation for trestle:
- - electric grid,
- - termooil feed,
- - of bark shop,
- - of the power generating unit,
- the arrangement of crushed stone and concrete preparation of the monolithic stairs and of the monolithic electric dry area of the administrative domestic unit
- the arrangement of crushed stone and concrete of CPDV;
- the arrangement of crushed stone and concrete of the foundation of the gallery of spalok Fm-1;
- the arrangement of crushed stone and concrete of the foundation of the gallery of the electric cable;
- the fabrication of the frameworks and binding of the reinforcement of the gallery of the electric cable;
- concrete casting of the shop of preparation of wood fibre;
- the arrangement of the foundation and floor, binding frameworks of power unit;
- laying-up implementation (plates PF3, PF4, PF5, PF6);
- the implementation of compressor brick setting;
- the arrangement of crushed stone and concrete SH-3,SH-4;
- the arrangement of crushed stone and concrete of the foundation GPK;
- the arrangement of concrete wall of the GPK on the axe B 21-24;
- the fabrication of the frameworks and binding of the reinforcement GPK;
- the arrangement of the concrete in FOm3,FOm4,FOm5,FOm6, FOm10;
- concrete casting of anchor blocks;
- the arrangement of the foundation of CMS;
- the arrangement of the metal constructions of CMS;
- the arrangement of the floor of the CMS;
- construction of sewage rainwater cleaning structure;
- construction of TP and compressor station.
Performance time: 12 months (June 2009— June 2010). 








































|