MDF production plant

Zhytomyr region, 11-B Zhovtneva St., Korosten, Zhytomyr region

Completed in — 2010

Floor area: 42 hectares

The repair and construction work fulfilled:

  • earthwork operations;
  • installation of monolithic reinforced-concrete foundation for the compression apparatus of the main engineering building;
  • installation of monolithic reinforced-concrete foundation for the defibrator;
  • assemblage of column, beam, truss metal structures;
  • the arrangement of through tunnels 1, 2 of the main production complexes;
  • the arrangement of communication channels between the main press and the through tunnels 1, 2;
  • the arrangement of the monolithic foundation for the work with rubbing machine and diagonal saw;
  • the arrangement of the foundation plates, beam and columns of the laying-up shop;
  • the mounting of the metalwares, columns and girders;
  • the arrangement of the monolithic ferroconcrete foundations of the power generating unit for building and equipment;
  • the arrangement of the monolithic-frame part of the administrative-domestic building (ADB);
  • civil and erection works of ADB, inner and outer finishing work of ADB, the installation of inner networks of ADB;
  • the arrangement and the mounting of inner and outer walling of ADB;
  • the arrangement of crushed stone and concrete preparation, the arrangement of surface proofer with polymeric materials of ferroconcrete constructions;
  • the arrangement of of the monolithic ferroconcrete foundations, foundation beams, socle of wooden fibre preparation shop;
  • the arrangement of the monolithic ferroconcrete foundations, foundation beams of bark shop;
  • the arrangement of walling of the wooden fibre preparation shop;
  • the arrangement of the civil and erection and finishing works of the wooden fibre preparation shop;
  • the arrangement of the foundations, foundation beams, socle of the main production complex (MPC);
  • the arrangement of the monolithic concrete industrial floor:
  • - of main press,
  • - of through tunnels 1, 2,
  • -of building of bark shop,
  • - of the wooden fibre preparation shop,
  • - of the power generating unit;
  • the arrangement of the monolithic ferroconcrete foundation for trestle:
  • - electric grid,
  • - termooil feed,
  • - of bark shop,
  • - of the power generating unit,
  • the arrangement of crushed stone and concrete preparation of the monolithic stairs and of the monolithic electric dry area of the administrative domestic unit
  • the arrangement of crushed stone and concrete of CPDV;
  • the arrangement of crushed stone and concrete of the foundation of the gallery of spalok Fm-1;
  • the arrangement of crushed stone and concrete of the foundation of the gallery of the electric cable;
  • the fabrication of the frameworks and binding of the reinforcement of the gallery of the electric cable;
  • concrete casting of the shop of preparation of wood fibre;
  • the arrangement of the foundation and floor, binding frameworks of power unit;
  • laying-up implementation (plates PF3, PF4, PF5, PF6);
  • the implementation of compressor brick setting;
  • the arrangement of crushed stone and concrete SH-3,SH-4;
  • the arrangement of crushed stone and concrete of the foundation GPK;
  • the arrangement of concrete wall of the GPK on the axe B 21-24;
  • the fabrication of the frameworks and binding of the reinforcement GPK;
  • the arrangement of the concrete in FOm3,FOm4,FOm5,FOm6, FOm10;
  • concrete casting of anchor blocks;
  • the arrangement of the foundation of CMS;
  • the arrangement of the metal constructions of CMS;
  • the arrangement of the floor of the CMS;
  • construction of sewage rainwater cleaning structure;
  • construction of TP and compressor station.
Performance time: 12 months (June 2009— June 2010).










































© 2006—2010 Energobud