The Hotel Complex of the CJSC "Prykarpattransgas"Ivano-Frankivsk, 48 Nezalezhnosti Str.
Completed in — 2006 Floor area: 200 sq. m
The repair and construction work fulfilled: - installation of floor cement covering;
- wall and floor lining with ceramic tiles;
- plasterboard works (walls, partitions);
- installation of suspended ceilings from Armstrong tiles;
- filling with putting, walls and ceiling painting;
- laying of the internal systems of sewerage and water supply, weak-current circuits, internal systems of electricity and heating.
Performance time: six weeks. |