EN

Supermarket "Favorite"

Chernivtsi, 194-А Rus’ka Str.

Completed in — 2006

Floor area: 1800 sq. m

The repair and construction work fulfilled:

  • installation of floor cement covering;
  • wall lining with ceramic tiles, floor lining with ceramic granite tiles;
  • plasterboard works (walls, partitions);
  • installation of suspended ceilings from Armstrong tiles;
  • filling with putting, walls and ceiling painting;
  • laying of internal systems, power supply, water supply, sewerage and heating;
  • installation of ventilation and air conditioning system.
Performance time: five months.




© 2006—2010 Energobud